Disaster Recovery

REMOBILIZATION

•  Utilization of hotshot network covering

    remobilization linehauls

•  On-site crane for handling

•  On-site technicians to manage 

    disconnect and loading

 

•   Commitment to a reposition of

     equipment up to 300 miles within a 

     12 to16 hour window including

     loading, bracing, linehaul and

     delivery

GENERATOR FLEET MANAGEMENT

●  24/7 turnkey support with minimal

             supervision

○  Staffing

○  Transportation

○  Refueling

○  Communication

○  Logistics

  • Highly trained, detail-oriented PMs able to make quick decisions with a high degree of coordination

 

 

guy on site.jpg
Promo Deck-shutterstock_1508517869-1.jpg
image005.jpg

DISASTER RECOVERY: FINAL MILE

Final Mile Deliveries

•  SEL straight truck/hotshot network for  

    final deliveries

- 16,000+ active carriers

- Additional 7500 “on demand

  drivers” that would become

  available for DR work

•  On-site cranes for unloading cargo 

    within strategic markets

•  On-site personnel to monitor unloading

    and manage hook ups

•  24/7 monitoring by Control Tower

    FMCSA Waivers remain in place

On-Site Coordination

 

Hookups & Disconnects

•  Advance load planning based on client

    sites

•  SOP training for unloading and

    installation

•  Control Tower coordinates and

    dispatches regional technicians to

    deployment sites

•  Technicians arrive 60 minutes in

    advance of generator delivery to site

•  Completion and testing of installation

•  Driver checklist including photo POD

    process for real time updating